Are Requirements the same as Benefits in this example? 

Dear Business Analysts.

 

I am required to create a benefits tracking for my project. I am just feeling that I have done this through requirements gathering and the justification of each requirement that links to a tangible expected benefit. I have also done the acceptance criteria and how the achievement of that requirement will be assessed. From that basis I feel that I have done a bit of benefits tracking.

An example of what I am talking about:

Requirement: The system must be able to transfer 100k files per day

Justification: To increase the daily capacity in processing applications automatically, and to reduce the waiting time for 40 applications by 24 hours each.

Acceptance Criteria:  Assurance that the received volumes of applications are up to the new maximum capacity of 140 applications.

Acceptance Method: Daily reviews of the number of applications received/ of total available applications. To be assured by a system generated report that include each application with its reference number.

MOSCOW: Must

Requirement Maturity Time: Instantly post system roll-out

My question was this an example of a benefit tracking too as much as it is a requirement documentation?

Many thanks

 

 

 
New Post 6/23/2020 6:48 PM
User is offline Kimbo
456 posts
5th Level Poster


Re: Are Requirements the same as Benefits in this example? 
Modified By Kimbo  on 6/23/2020 9:50:59 PM)

Hi MadiMo,

This probably describes the benefit in your example:

"Justification: To increase the daily capacity in processing applications automatically, and to reduce the waiting time for 40 applications by 24 hours each."

The benefits might be something like:

"Application processing wait time reduced by 24 hours"

"Maximum capacity of applications increased to 140 per day"

These contain metrics that can be measured easily. 

You might also consider what happens if the maximum capacity is breached in a day.

Kimbo

 

 
New Post 6/26/2020 1:36 AM
User is offline MadiMo
31 posts
9th Level Poster


Re: Are Requirements the same as Benefits in this example? 

Hi Kimbo,

 

Thank you for the reply, I understand your point, which is useful. I just wonder when it comes to benefit tracking is the tracking tools I added here for the requirement can be used for the benefit as the same? 

Thanks,

 

Madi

 
Previous Previous
 
Next Next
  Modern Analyst Forums  Business and Sy...  Requirements  Are Requirements the same as Benefits in this example?

Community Blog - Latest Posts

As Business Analysts in Agile teams, we often hear about Definition of Ready (DOR) and Definition of Done (DOD). But beyond the buzzwords, these two concepts are powerful tools to drive clarity, consistency, and quality in our work. Definition of Ready ensures a user story is truly ready for development. It answers: Is this story clear, feasible...
In today's fast-paced digital world, successful projects aren't just built on great code—they're built on clarity. And that clarity often comes from one key player: the Business Analyst. At the heart of every great product or system is a need—a business goal, a customer pain point, or a regulatory requirement. But busines...
I have always loved cooking. I learned from my Grandma June and her kitchen was her sanctuary, a small, warm sunlit space filled with jars of spices, stacks of cookbooks, and the comforting smell of something always on the stove or baking in the oven. Grandma June was as great a cook as she was a teacher to me. She never followed a recipe “to...

 






 

Copyright 2006-2025 by Modern Analyst Media LLC